LTLUCAS TANINDUSTRIAL PROPERTY CONSULTANT
中文
← Back to projects

PROJECT COLLECTION / South Klang Valley

Pulau Meranti 2

Puchong / Factory

LocationPuchong
Land area range8,072–17,701 sq ft
Built-up area range6,373 sq ft

Sources reviewed: 12 October 2026 · See specification notes below

Pulau Meranti 2
Project reference image · Renderings do not represent completed units · Open image for full detail
THE PROJECT

Know the space.
Plan the next move.

Indicative factory starting priceFrom RM 4 million

Developer-published project starting price; confirm applicable layout and availability. Source updated: 2026-10-12

Binastra Business Park at Pulau Meranti 2 in Puchong. The company schedule covers several factory layouts; the relevant unit and current building plans should be confirmed.

Developer / project party · Binastra Land

Starting prices and area ranges may refer to different units. Sources can cover different phases and configurations; confirm current pricing, permitted use, delivery and specifications with Lucas.

Layouts & operating specifications

SPACE & SPECIFICATIONS

Each configuration is listed separately. Floor loading and height must be confirmed for the relevant floor and intended use.

01

Type A

Land area
10,852 - 11,751 sqft
Built-up area
GF : 3,923 sqft 1F: 2,057 sqft 2F: 3,957 sqft
Power supply
150 Amps
Floor loading
Ground floor 1 tonne 2nd floor 0.5 tonne
Height
27' 15' 12' 15' total height 42'

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
02

Type B

Land area
8,072 - 9,740 sqft
Built-up area
6,373 sqft 36' x 79'
Power supply
150 Amps
Floor loading
Ground floor 1 tonne 2nd floor 0.5 tonne
Height
27' 15' 12' 15'

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
03

Type C

Land area
17,701 sqft
Built-up area
Subject to current drawing verification
Power supply
150 Amps
Floor loading
Ground floor 1 tonne 2nd floor 0.5 tonne
Height
27' 15' 12' 15'

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
Information & image sources

Base specifications follow the company project schedule. Sources may cover different phases or configurations; Lucas can help reconcile the details.

Project sources reviewed 12 October 2026; imagery remains project reference material.

Published reference 1 ↗Original image source ↗