LTLUCAS TANINDUSTRIAL PROPERTY CONSULTANT
中文
← Back to projects

PROJECT COLLECTION / North Selangor

Nova Business Park

Sungai Buloh / Business space

LocationSungai Buloh
Land area range7,800–16,885 sq ft
Built-up area range5,908–10,143 sq ft

Sources reviewed: 12 October 2026 · See specification notes below

Nova Business Park
Project reference image · Renderings do not represent completed units · Open image for full detail
THE PROJECT

Know the space.
Plan the next move.

Ask Lucas for current pricing

A business park along Jalan Sungai Buloh combining office, display and storage space. It is classified here as business space; the permitted use of each unit requires confirmation.

Starting prices and area ranges may refer to different units. Sources can cover different phases and configurations; confirm current pricing, permitted use, delivery and specifications with Lucas.

Layouts & operating specifications

SPACE & SPECIFICATIONS

Each configuration is listed separately. Floor loading and height must be confirmed for the relevant floor and intended use.

01

Type A1 (28units) 3 storey Semi D

Land area
60' x 130' 7,800 - 16,579 sqft
Built-up area
5,908 sq ft
Power supply
150 Amps
Floor loading
GF 0.75 tonne 1F 0.25 tonne 2F 0.25 tonne
Height
11m

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
02

Type A2&A3 (4 units) 4 storey Semi D

Land area
60' x 130' 8,209 - 10,938 sqft
Built-up area
Subject to current drawing verification
Power supply
150 Amps
Floor loading
Basement 0.5 tonnes GF 0.75 tonne 1F 0.25 tonne 2F 0.25 tonne
Height
5m every floor

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
03

Type B (1 unit) 3 storey detached

Land area
75'/183' x 130' 16,885 sqft
Built-up area
10,143 sq ft
Power supply
200 Amps
Floor loading
GF 0.75 tonne 1F 0.25 tonne 2F 0.25 tonne
Height
14m

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
Information & image sources

Base specifications follow the company project schedule. Sources may cover different phases or configurations; Lucas can help reconcile the details.

Project sources reviewed 12 October 2026; imagery remains project reference material.

Published reference 1 ↗Original image source ↗