Detached factories in Kapar, combining production and warehousing with multi-level offices on a self-contained plot.
Starting prices and area ranges may refer to different units. Specifications vary by phase and configuration; confirm current pricing, permitted use, delivery and specifications with Lucas.
Layouts & operating specifications
Available specifications are shown by configuration. Ask about any unlisted requirements; confirm floor-specific loading and height before deciding.
How to read these specifications+
Specification notes · Before you compare
Areas shown are reference configurations, not confirmation of current stock. Project ranges may cover different layouts; confirm the selected unit, current drawings and available space with Lucas. Unlisted technical specifications remain subject to confirmation.
Additional configurations for comparison. Confirm the phase, specific lot and applicable specification. Use current drawings for the selected unit to resolve differences.
References do not establish current stock, sold-out status, current prices or delivery commitments. Verify clear height, floor height and loading by floor and functional area; these are not interchangeable.
Project strengths
A detached operating footprint
Review building use, parking and loading needs across the whole site.
Factory and management in one place
Production areas and multi-level offices bring the operating team into one address.
A location that works for your operation.
WCE access supports onward routes towards Shah Alam, Port Klang and the airports.
The wider setting
Located along Jalan Bukit Kerayong in the Kapar industrial area.
Landmarks & connections
WCEApprox. 4.4 km / Approx. 10 min
Shah AlamApprox. 24 km / Approx. 26 min
Port KlangApprox. 27 km / Approx. 32 min
Subang AirportApprox. 39 km / Approx. 40 min
Distances and journey times are approximate project-location references, not live navigation. Endpoints, routes and traffic affect actual journeys; check truck access separately.
Bring your operating brief to the viewing
Which phase, type and plot is being offered?
How are production, office and external areas allocated?
Build an informed purchase shortlist.
Define area, equipment, transport and timing for the chosen plot or configuration, then confirm pricing, use and delivery.