LTLUCAS TANINDUSTRIAL PROPERTY CONSULTANT
中文
← Back to projects

PROJECT COLLECTION / West Selangor

West Coast

Kapar / Factory

LocationKapar
Land area range51,836–72,309 sq ft
Built-up area range31,500–50,800 sq ft

Sources reviewed: 12 October 2026 · See specification notes below

West Coast
Project reference image · Renderings do not represent completed units · Open image for full detail
THE PROJECT

Know the space.
Plan the next move.

Ask Lucas for current pricing

Detached factories in Kapar’s industrial corridor. Evaluate the land footprint, logistics access and building layout together when shortlisting a facility for your business.

Starting prices and area ranges may refer to different units. Sources can cover different phases and configurations; confirm current pricing, permitted use, delivery and specifications with Lucas.

Layouts & operating specifications

SPACE & SPECIFICATIONS

Each configuration is listed separately. Floor loading and height must be confirmed for the relevant floor and intended use.

01

Detached A

Land area
1.37 acres 59,677 sqft
Built-up area
31,500 sqft
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
02

Detached B

Land area
1.19 acres 51,836 sqft
Built-up area
Subject to current drawing verification
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
03

Detached C

Land area
1.66 acres 72,309 sqft
Built-up area
50,800 sq ft
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
04

Detached D

Land area
1.4 acres 60,984 sqft
Built-up area
39,680 sqft
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
Information & image sources

Base specifications follow the company project schedule. Sources may cover different phases or configurations; Lucas can help reconcile the details.

Project sources reviewed 12 October 2026; imagery remains project reference material.

Published reference 1 ↗Original image source ↗