LTLUCAS TANINDUSTRIAL PROPERTY CONSULTANT
中文
← Back to projects

PROJECT COLLECTION / Southwest Selangor

Tenda Industrial Park Ph1

Telok Panglima Garang / Factory

LocationTelok Panglima Garang
Land area range23,917–29,428 sq ft
Built-up area range18,425–23,297 sq ft

Sources reviewed: 12 October 2026 · See specification notes below

Tenda Industrial Park Ph1
Tenda park-wide plan · Not a specific phase or configuration · Open image for full detail
THE PROJECT

Know the space.
Plan the next move.

Ask Lucas for current pricing

Phase 1 of Tenda Industrial Park in Telok Panglima Garang. Its semi-detached configurations are listed separately from Phase 2 so you can compare the relevant layouts.

Developer / project party · Tenda Development

Starting prices and area ranges may refer to different units. Sources can cover different phases and configurations; confirm current pricing, permitted use, delivery and specifications with Lucas.

Layouts & operating specifications

SPACE & SPECIFICATIONS

Each configuration is listed separately. Floor loading and height must be confirmed for the relevant floor and intended use.

01

Semi D Type 2B

Land area
120' x 194' 23,917sqft
Built-up area
18,425 sq ft
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
02

Semi D Type 3A

Land area
120' x 215' 25,188 sqft
Built-up area
19,643 sq ft
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
03

Semi D Type 1B

Land area
120' x 245' 29,428 sqft
Built-up area
23,297 sq ft
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
04

Semi D Type 3B

Land area
120' x 215' 26,447 sqft
Built-up area
20,429 sq ft
Power supply
400 Amps
Floor loading
3 tonnes
Height
40 ft

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
Information & image sources

Base specifications follow the company project schedule. Sources may cover different phases or configurations; Lucas can help reconcile the details.

Project sources reviewed 12 October 2026; imagery remains project reference material.

Published reference 1 ↗Original image source ↗