LTLUCAS TANINDUSTRIAL PROPERTY CONSULTANT
中文
← Back to projects

PROJECT COLLECTION / West Selangor

H&A Setia Alaman

Setia Alam / Factory

LocationSetia Alam
Land area range8,950–27,382 sq ft
Built-up area range7,436–18,041 sq ft

Sources reviewed: 12 October 2026 · See specification notes below

H&A Setia Alaman
Project reference image · Renderings do not represent completed units · Open image for full detail
THE PROJECT

Know the space.
Plan the next move.

Indicative factory starting priceFrom RM 5 million

Published project starting price; confirm the applicable configuration and available units. Source updated: 2026-10-06

An industrial development in Setia Alaman with cluster, semi-detached and detached configurations. Compare the individual layouts to establish the right balance of production, office and external space.

Developer / project party · H&A Holdings

Starting prices and area ranges may refer to different units. Sources can cover different phases and configurations; confirm current pricing, permitted use, delivery and specifications with Lucas.

Layouts & operating specifications

SPACE & SPECIFICATIONS

Each configuration is listed separately. Floor loading and height must be confirmed for the relevant floor and intended use.

01

Cluster Semi D KK1

Land area
74'77" x 120' 8,950 sqft
Built-up area
7,436 sq ft
Power supply
150 Amps
Floor loading
3 tonnes
Height
12m

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
02

Semi D KB2A End lot Unit 49

Land area
22,377 sqft
Built-up area
14,524 sq ft
Power supply
150 Amps
Floor loading
3 tonnes
Height
12m

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
03

Detached KS1 Unit 41

Land area
27,382 sqft
Built-up area
18,041 sq ft
Power supply
200 Amps
Floor loading
3 tonnes
Height
12m

Configuration pricing: confirm with Lucas

Enquire about this layout ↗
Information & image sources

Base specifications follow the company project schedule. Sources may cover different phases or configurations; Lucas can help reconcile the details.

Project sources reviewed 12 October 2026; imagery remains project reference material.

Published reference 1 ↗Published reference 2 ↗Original image source ↗