Project reference image · Renderings do not represent completed units · Open image for full detail
Eco Business Park 7 · Negeri Sembilan · MVV 2.0 · Industrial property comparisons & purchase enquiries
Project overview
An industrial park within Malaysia Vision Valley 2.0, with factory and land options for different stages of expansion.
Starting prices and area ranges may refer to different units. Specifications vary by phase and configuration; confirm current pricing, permitted use, delivery and specifications with Lucas.
Layouts & operating specifications
Available specifications are shown by configuration. Ask about any unlisted requirements; confirm floor-specific loading and height before deciding.
How to read these specifications+
Specification notes · Before you compare
Only supported specifications are shown. Blank fields require the selected unit’s current drawings. Confirm availability, permitted use and delivery before committing.
Additional configurations for comparison. Confirm the phase, specific lot and applicable specification. Use current drawings for the selected unit to resolve differences.
Cluster Factory 60' x 100'Cluster Factory · 3,300 sq ft+
References do not establish current stock, sold-out status, current prices or delivery commitments. Verify clear height, floor height and loading by floor and functional area; these are not interchangeable.
Project strengths
Two development routes
Compare a defined factory product with industrial land according to your construction programme.
Airport and southern-market context
The Negeri Sembilan location places KLIA and north–south movement within its regional planning.
A location that works for your operation.
B48 links toward KLIA and Sungai Pelek/Sepang; NLE and the additional B48 connection are planned infrastructure.
The wider setting
Part of MVV 2.0 Parcel C, with facilities and delivery organised by phase.
Landmarks & connections
KLIALocation / road connection
Sungai Pelek / SepangLocation / road connection
MVV 2.0 Parcel CLocation / road connection
Bring your operating brief to the viewing
Which phase is the unit in and when is handover?
What truck route works today without future roads?
Do power, floor load and loading space suit my operation?
Build an informed purchase shortlist.
Define area, equipment, transport and timing for the chosen plot or configuration, then confirm pricing, use and delivery.