LTLUCAS TANINDUSTRIAL PROPERTY CONSULTANT
中文
← Back to projects

Southwest Selangor

Activus Banting Industrial Park

Banting / Factory

Activus Banting Industrial Park
Project reference image · Renderings do not represent completed units · Open image for full detail

Activus Banting Industrial Park · Banting · Industrial property comparisons & purchase enquiries

Project overview

Standalone Banting premises pairing a corporate frontage with a wide, column-free industrial hall.

Starting prices and area ranges may refer to different units. Specifications vary by phase and configuration; confirm current pricing, permitted use, delivery and specifications with Lucas.

Layouts & operating specifications

Available specifications are shown by configuration. Ask about any unlisted requirements; confirm floor-specific loading and height before deciding.

How to read these specifications

Specification notes · Before you compare

Only supported specifications are shown. Blank fields require the selected unit’s current drawings. Confirm availability, permitted use and delivery before committing.

FlexEdge standalone factory

Enquire about this layout ↗
Land / lot reference
Confirm for the selected unit
Built-up area
To confirm
Power supply
To confirm
Floor loading
To confirm
Height reference
Rear ridge: 12 m

Project strengths

More freedom to plan

A roughly 70ft-wide column-free hall gives flexibility for equipment, racking and workflow.

Distinct operating zones

Front loading combines with mezzanine and first-floor offices; the rear industrial ridge reaches about 12m.

A location that works for your operation.

Local access via Jalan 8 and Jalan Banting–Semenyih connects with routes towards WCE, SKVE and ELITE.

The wider setting

An existing industrial setting supports planning for Banting operations and airport- or port-bound distribution.

Landmarks & connections

  • Banting TownApprox. 10 km
  • KLIAApprox. 18 km
  • CyberjayaApprox. 21 km
  • PutrajayaApprox. 30 km
  • Port KlangApprox. 42 km

Distances and journey times are approximate project-location references, not live navigation. Endpoints, routes and traffic affect actual journeys; check truck access separately.

Bring your operating brief to the viewing

Build an informed purchase shortlist.

Define area, equipment, transport and timing for the chosen plot or configuration, then confirm pricing, use and delivery.

Lucas Tan · GAP Estate · Shortlisting & viewing enquiries